How to use it
Add up the input ratings (Btu/h, on each appliance's rating plate) of every appliance the section of pipe feeds. Measure the length of pipe from the meter outlet to the farthest appliance, and use that one length for every section. Enter both: the calculator turns the load into cubic feet per hour and picks the smallest pipe in the table that carries it. Repeat for each section, from the meter out, each time with the load of only the appliances downstream of it.
Gas pipe sizing chart (CFH)
| Length (ft) | 1/2 in | 3/4 in | 1 in | 1-1/4 in | 1-1/2 in | 2 in | 2-1/2 in | 3 in |
|---|---|---|---|---|---|---|---|---|
| 10 | 172 | 360 | 678 | 1,390 | 2,090 | 4,020 | 6,400 | 11,300 |
| 20 | 118 | 247 | 466 | 957 | 1,430 | 2,760 | 4,400 | 7,780 |
| 30 | 95 | 199 | 374 | 768 | 1,150 | 2,220 | 3,530 | 6,250 |
| 40 | 81 | 170 | 320 | 657 | 985 | 1,900 | 3,020 | 5,350 |
| 50 | 72 | 151 | 284 | 583 | 873 | 1,680 | 2,680 | 4,740 |
| 60 | 65 | 137 | 257 | 528 | 791 | 1,520 | 2,430 | 4,290 |
| 70 | 60 | 126 | 237 | 486 | 728 | 1,400 | 2,230 | 3,950 |
| 80 | 56 | 117 | 220 | 452 | 677 | 1,300 | 2,080 | 3,670 |
| 90 | 52 | 110 | 207 | 424 | 635 | 1,220 | 1,950 | 3,450 |
| 100 | 50 | 104 | 195 | 400 | 600 | 1,160 | 1,840 | 3,260 |
| 125 | 44 | 92 | 173 | 355 | 532 | 1,020 | 1,630 | 2,890 |
| 150 | 40 | 83 | 157 | 322 | 482 | 928 | 1,480 | 2,610 |
| 175 | 37 | 77 | 144 | 296 | 443 | 854 | 1,360 | 2,410 |
| 200 | 34 | 71 | 134 | 275 | 412 | 794 | 1,270 | 2,240 |
| 250 | 30 | 63 | 119 | 244 | 366 | 704 | 1,120 | 1,980 |
| 300 | 27 | 57 | 108 | 221 | 331 | 638 | 1,020 | 1,800 |
| 350 | 25 | 53 | 99 | 203 | 305 | 587 | 935 | 1,650 |
IFGC Table 402.4(2), also IRC Table G2413.4(1): Schedule 40 metallic pipe, natural gas, inlet pressure less than 2 psi, pressure drop 0.5 in. w.c., specific gravity 0.60. Capacities are in cubic feet of gas per hour; at about 1,000 Btu per cubic foot, 1 CFH carries about 1,000 Btu/h.
A worked example
A furnace of 100,000 Btu/h and a water heater of 40,000 Btu/h, with the farthest appliance 60 ft of pipe from the meter. Every section uses the 60 ft row. The pipe from the meter to the first tee carries 140 CFH, so it needs 1 in (257 CFH; 3/4 in carries only 137). The branch to the furnace carries 100 CFH: 3/4 in. The branch to the water heater carries 40 CFH: 1/2 in.
When this table does not apply
This table is for natural gas at a standard low pressure with a 0.5 in. w.c. drop allowed. It does not cover propane, elevated pressure (2 psi and up), CSST or copper tubing, or polyethylene pipe, which each have their own tables. Some jurisdictions and gas suppliers require a smaller allowed drop, such as 0.3 in. w.c., which gives smaller capacities. Ask the inspector whether your jurisdiction wants an equivalent length added for fittings.
Gas work needs a licence and a permit
In most places, gas piping must be installed or altered by a licensed gas fitter or plumber, under a permit, and pressure-tested and inspected before it is used. This chart is for understanding and checking a design. The adopted code where you are, the local gas supplier's rules and the inspector decide what is required. If you smell gas, leave the building and call the gas supplier's emergency line from outside.
These calculators do the arithmetic only. Check every measurement and cut before you make it, and follow the drawings, the code and the engineer of record for anything that carries pressure or load.